A double-girder straddle carrier over a bridge beam in a casting yard
Bridge beams are carried between the legs, not slung from a hook at one end. The portal, the lifting points and the route are set by the beam, not by the machine alone.
Short answer

A bridge construction carrier is sized by the beam, not by its tonnage alone. Length and lifting-point spacing set the portal length, the beam section sets the attachment, and the route — casting bed to storage to trailer or launching position — sets the steering, the wheel loads and the ground the machine must travel on. Two beams of the same weight can need very different machines if one is short and stiff and the other is long and flexible.

Bridge work is where the straddle carrier earns its place most clearly. A precast beam, a box girder and a bridge segment all share the same problem: they are too long for a forklift, too awkward for a truck alone, and too valuable to handle twice. The carrier picks the unit up where it is cast or stored, travels with it under its own power, and sets it down where the next operation starts. No transfer to a trailer in between, no second lift at the far end.

This page covers how we specify a carrier around bridge duty: what the beam data changes, how lifting points are handled, how the yard and the site road constrain the machine, and what to send with an enquiry.

Why bridge beams are a different duty

Four properties of a bridge unit drive most of the design decisions.

  • Length. The unit is long relative to its width and height. Deflection, support spacing and the swept path on a corner matter more than they do for a compact load of the same weight.
  • Support sensitivity. A precast beam is designed to be supported at defined points. Lift it at the wrong points, or support it unevenly while travelling, and the unit itself — not just the machine — is at risk.
  • Finished surfaces. Bearing faces, prestressing anchorages and reinforcement that protrudes from the unit all limit where an attachment may bear and how the unit may be set down.
  • Sequence. Casting, curing, storage, transport and erection are a chain. A carrier that fits the casting yard but cannot reach the trailer, or fits the trailer but cannot enter the storage row, breaks the chain.

Throughput matters too. A yard casting one beam a week and a yard casting several a day need different duty classifications, even for the same beam. That difference belongs in the classification of the machine, not in a margin added at the end.

The beam as a load

Bridge units vary widely, and the variation is what the specification must capture. A short precast beam, a long box girder and a segment for a balanced-cantilever deck are not interchangeable loads, even when their weights overlap.

What each beam dimension changes in the machine specification
Beam dataWhat it changes
Weight rangeRated capacity at the actual load centre, and the wheel loads that go back to the slab, hardstanding or site road.
Length and cross-sectionPortal length, inside width and the spacing of the lifting points.
Lifting-point positionsAttachment type, beam or spreader length, and whether the unit can be lifted level.
Support points in storageHow the unit is set down, and whether the carrier must straddle a storage row or a support frame.
Flexibility and camberHow much the unit may deflect under its own weight while carried, and how level the lift must be kept.
Transport interfaceTrailer, beam transporter or launching position, and the height and approach angle of each.
ThroughputDuty classification, drive choice, and whether one machine or two working in tandem is the cheaper answer.

Send the range, not the average. The machine is normally sized by the longest and heaviest unit in the programme, and checked against the shortest, because a short unit can be harder to support correctly than a long one.

Lifting points and attachments

The attachment for a bridge unit is decided by the lifting points the designer allows, not by preference. There are three normal arrangements.

Bridge lifting arrangements compared
ArrangementWorks well forWatch out for
Lifting beam with multiple pointsLong beams and girders that must be supported at several points to limit deflection.Beam length, point spacing and levelling all have to match the unit; a beam built for one section will not fit another.
Slings from the portalShorter units and units with cast-in lifting points that suit a direct sling.Sling angle, edge protection and the risk of the unit rotating if the points are not level.
Twin carriers in tandemUnits longer than a single portal can span, where two machines share the load.Synchronisation, route width and a level travel surface become critical; tandem work is a procedure, not just two machines.

Two rules come out of practice. First, the lifting points must be confirmed on the drawing before the machine is specified — a carrier built around assumed points is a carrier that may not be allowed to lift the beam. Second, protection at the contact faces matters: pads, liners and radiused bearing surfaces are cheaper than damage to a finished unit.

Machine configuration

With the load settled, the machine is a set of clearances and weights.

  • Portal length and inside width are set by the longest unit plus its lifting beam plus operating clearance — not by the unit alone. Where the machine must straddle a casting bed or a storage row, that width governs.
  • Clear lift height is set by the highest stack, support frame or trailer the machine must clear, plus the attachment depth.
  • Rated capacity is quoted at a load centre. With bridge duty the centre is often offset by the lifting beam, so always compare at the real centre of gravity.
  • Wheel arrangement follows the ground. Casting yards are often concrete, site roads are often compacted hardstanding, and the loaded wheel load is the number the structural and civil engineers need.
  • Steering modes decide how the machine leaves a casting bed and enters a storage row. Crab and multi-wheel steering reduce the swept path in yards laid out for beams, not for trucks.
  • Cab position and visibility matter because the operator has to see both lifting points and the far end of a long unit at the same time.

The published 35 t, 60 t and 80 t models on the specifications page show the dimensions we can quote without a project-specific design. Above that, and for unusual beam geometry, the machine is designed around the duty — the selection guide sets out the order in which those numbers should be fixed.

Yard, route and site road

Bridge yards are rarely flat, straight and empty. The route is usually the tightest constraint in the project.

  • Route width measured along the full loaded route, including corners, the approach to each storage row and the turn onto the site road.
  • Storage geometry: support spacing, row pitch, and whether units are stored single-tier or stacked on frames.
  • Transport interface: flatbed trailer, beam transporter or launching position, and the height and approach angle of each.
  • Overhead obstructions: crane runways, gantries, lighting and temporary works — checked for the tallest lift, not the average.
  • Ground: slab joints, drains, slopes, and any area where the hardstanding is thinner than the rest. A long unit carried over a dip will load its supports unevenly.
A straddle carrier travelling with a long bridge beam in a yard
Bridge yards are laid out for beams, not for trucks. The route, the turning envelope and the storage rows are set together.

Safety and control

Bridge incidents tend to be expensive rather than frequent, and most of them start with support or levelling rather than with the machine.

  • Lift only at the designed points. If the points on site do not match the drawing, stop and confirm — do not improvise a new point.
  • Keep the lift level. A long unit that tilts will load one end and one support more than the other, and can damage the unit before anyone notices.
  • Load monitoring and limits should be visible to the operator, not only recorded. Overload protection, hoist limits and anti-sway are standard on this class of machine.
  • Exclusion zones during lifting, because a long unit has a larger footprint than the machine and the operator cannot see all of it.
  • Weather matters outdoors: wind load on a long unit, and water or ice on the hardstanding.

Where the operator cannot see the far lifting point, the answer is usually a combination of cab position, camera coverage and a banksman procedure — decided with the yard, before the machine is built.

Drive and environment

Bridge yards are split between outdoor casting yards and covered bays, and the drive choice follows the site.

  • Diesel remains the default for outdoor yards with long routes: no trailing cable, no charging infrastructure, and full performance on gradients.
  • Electric suits covered bays and indoor casting halls, where exhaust and noise are the constraint. It needs a charging or cable strategy that fits the shift pattern.
  • Hybrid sits between them: smaller engine, recovering energy from hoist lowering, and lower fuel burn in stop-start duty.
  • Site conditions change the specification: dust, heat, cold, hydraulic oil grade, battery behaviour, filtration and the operator cab.

Duty class and drive should be decided together. A three-shift electric machine with no time to charge is a worse investment than a diesel one, and an indoor diesel machine may not be permitted at all. The cost drivers page explains how drive, duty and attachment affect the total rather than the purchase price alone.

Standards and documentation

Bridge carriers are designed and documented against the same crane standards as other lifting machines. The relevant ones for this duty are:

  • ISO 4301-1 and ISO 4301-5 — classification of the machine by duty.
  • FEM 1.001 — classification and design rules for lifting appliances.
  • EN 15011 — bridge and gantry cranes, which covers the structural approach for portal machines.
  • IEC 60204-32 — electrical equipment of hoisting machines.
  • ISO 12488-1 — tolerances for wheels and travel tracks.

Standards are cited by number here; the edition that applies to a given contract is confirmed with the drawing package, because editions change and a machine designed to a withdrawn edition is a documentation problem at handover. Ask for the classification, the load chart and the wheel-load calculation as a set — they should agree with each other.

Beyond beams: segments, panels and girders

Most bridge yards handle more than one unit type. If the machine is going to serve the whole site, say so at the start; a carrier specified for beams alone may be the wrong shape for segments.

Box girders

Wide, closed sections that need a long portal and a multi-point beam, with clearance checked at every corner.

A straddle carrier over a wide box girder in a yard

Bridge segments

Shorter, heavier units where support spacing and levelling matter more than portal length.

A straddle carrier carrying a bridge segment between storage rows

Precast panels and piles

Related precast work that often shares the same yard, route and trailer as the beams.

A straddle carrier in a precast yard with panels and beams

Loading and dispatch

The last few metres — trailer, transporter or launching position — decide how much control the operator needs.

A bridge construction site with a long beam on a transport route

The documented case library includes heavy straddle carriers and gantry machines built for bridge and precast yards, which is often the fastest way to see how a similar duty was solved.

What to send with an enquiry

Six items are enough for a first configuration. Without them, any reply is a guess.

  • Beam or segment weight range, length, cross-section and lifting-point positions.
  • Support points in storage, and whether the machine must straddle a casting bed or a support frame.
  • A yard plan with casting beds, storage rows, aisles, transport interface and overhead obstructions.
  • Ground information: surface, slab or hardstanding, and any structural drawing available.
  • Throughput and shift pattern, so duty class and drive can be set against the real workload.
  • Drawings of the unit, including any protruding reinforcement or anchorages that limit where an attachment may bear.

Send them as drawings, photographs or a spreadsheet — whatever exists. The review usually identifies one or two numbers that decide the machine, and those are rarely the ones on the enquiry form.

Bridge construction FAQ

Can one machine handle beams, girders and segments?

Often, yes, if the portal and the lifting beam are sized for the longest and heaviest unit and the attachment can be changed or adjusted for the others. If the units differ greatly in length or lifting points, two machines or a tandem arrangement may be cheaper than one oversized machine.

Do we need two machines working in tandem?

Only if a single portal cannot span the unit at its designed support points. Tandem work needs synchronisation, a level route and a written procedure, so it is decided at specification stage, not improvised on site.

What if the lifting points on site do not match the drawing?

Stop and confirm. Lifting a beam at an unapproved point can damage the unit and invalidates the load case. The correct answer is a revised drawing, not a different sling.

Can the machine travel on a site road, not just a yard slab?

Yes, where the road is built for the loaded wheel loads and the route width and gradients are checked. Site roads need the same wheel-load calculation as a yard slab, and any thin or uncompacted section must be identified in advance.

Is a straddle carrier better than a mobile crane for beams?

For moving a beam from casting to storage to trailer, usually yes: the carrier lifts and carries in one sequence. A mobile crane lifts well but does not carry the beam over distance, so it needs a trailer and a second lift at each end.

What ground bearing capacity is needed?

It depends on the loaded wheel loads, which depend on the machine, the unit and the attachment. We return wheel loads per configuration — loaded and unladen — so your civil or structural engineer can check the slab or road against the real machine rather than an estimate.